Our Finished Projects

Treatment of erosion occurring in the left Euphrates River with a length of 1500 m in Abu Ghraib

Treatment of erosion occurring in the left Euphrates River with a length of 1500 m in Abu Ghraib

2022

4,985,478,640 IQD

Reconstruction Fund